Chimney Cap
The small cap that keeps rain, animals, and embers out — fitted while we're up there.
Learn moreBuilding new, or finally adding a working flue to a chimney that never had one? We install the complete system — clay tile, steel, or cast-in-place — pull the permits for you, and follow IRC and NFPA 211, choosing the flue material to match your fuel type and chimney height. Having one crew own the whole flue, cap, and termination means it's engineered to draft as a system from day one, and you deal with a single team handling the paperwork and the build together.
Flue installation answers a different question than relining: not 'what failed and how do we replace it,' but 'this chimney or appliance has no proper flue yet — how do we build the right one from nothing.' That covers three situations: a chimney going up in new construction, an appliance being added where no vent path serves it, and an old unlined masonry stack that's been burned for years with no liner at all and finally needs one. Here's how it differs from relining: relining replaces an existing liner that cracked or spalled, while flue installation creates the channel where none was ever present — so there's nothing to scope for failure, only an empty or unlined flue to specify and fit.
Because we're starting from scratch, the design work comes before any material is set. For new construction we lay the flue out with the masons — clay tile bedded square and plumb, or a stainless system in a framed chase — sized to the appliance outlet, the heat output, and the chimney height against the NFPA 211 venting tables and the appliance listing, so the flue is right the first time instead of corrected later. For an unlined masonry chimney we measure the actual clear inside dimension before deciding whether a stainless liner drops in or a cast-in-place poured-masonry flue gets formed in place. For an added appliance we route a dedicated flue, or, where a stack already exists, size a connection that doesn't orphan or overpower what's already venting there.
Material and method follow the use, and a first install lets us pick cleanly rather than work around a failure. Clay tile, bedded with the right refractory mortar and the correct expansion allowance, is the traditional choice for a new masonry chimney. A UL-1777 listed stainless system is the standard where we're lining an unlined stack or venting a modern appliance, with the alloy chosen to the fuel — 316Ti for wood, oil, coal, or high-sulfur fuels, the appropriate spec for gas. Where a masonry chimney is unlined and also weak, a cast-in-place liner both lines and structurally re-stiffens it in a single pour. How this differs from the flexible-liner page: that one is for retrofitting a corrugated liner down an existing offset flue, while here we're often building the flue path itself, where a straight, smooth-walled clay or rigid run is the better first-time choice.
When the install is complete we prove it the same way we would any flue: a draft test confirms the new flue pulls as designed, a smoke check confirms it is gas-tight, and we document the UL-1777 listing and NFPA 211 sign-off for the building permit and the certificate of occupancy — a first-time flue is usually inspected as part of the build, not after a failure. That documentation is what lets the inspector pass a brand-new flue without ambiguity. And because the same crew that builds the flue can frame the chase, run the venting, and finish the exterior, a first-time flue lands as part of one coordinated build rather than a hand-off between trades who've never met.
With our crew, a chimney flue installation is never guesswork. We scope every job from a graded, photographed inspection first — the NFPA 211 level the evidence calls for — so the work is matched to what your flue and masonry actually need, with the report to prove it. The documented inspection is the record the chimney flue installation is built on.
Chimney inspectionA chimney flue installation isn't a matter of opinion — it's held to published national standards. Texas Service builds every job to the named codes below and documents it, so the work is provably right for an inspector, an insurer, or a future buyer. These are the universal standards; your city's permit and inspection requirements are confirmed with the local authority before we pull the job.
When a metal or cast liner serves as the first-time flue, it goes in as a UL-1777 listed system with documentation for the building permit and inspection, never improvised pipe shoved down an unlined stack.
Flue size is worked out from the appliance outlet, heat output, and chimney height against the NFPA 211 venting tables and the appliance listing, because correct sizing at install is what keeps a brand-new flue drafting the way it should.
Each new clay-tile flue gets bedded in refractory mortar, set plumb, and built with the expansion allowance NFPA 211 requires. Skip any of those and the masons' first-time install cracks on its first heat cycle.
Clearance to combustibles is built into the new flue rather than retrofitted: 2 in at interior masonry and 1 in at exterior per the IRC, and a factory-built chimney holds whatever its listing specifies.
Codes cited are the established national standards (NFPA, UL, IRC) that govern this service. The adopted code edition, permit, and inspection requirements vary by city —Texas Service verifies them with your local authority having jurisdiction on every job.
Map the new flue path first and size it to the appliance, the fuel, and the chimney height, all before a single piece is set.
We pick clay tile, rigid stainless, or cast-in-place for a clean first-time install.
The new flue is bedded, supported, and sealed to code as the chimney or chase is built or lined.
A draft test plus documentation to hand to the building permit and the inspector.
We've worked on 1,000+ DFW homes over 10+ years. Every job — small sweep or full rebuild — runs the same way: certified technicians, written quotes, photo reports, warranty in writing.
A first-time flue planned out with your builder or mason and sized right before anything gets built
Clay tile, rigid stainless, or cast-in-place — picked for how the chimney is built, not as a last-minute fix
UL-listed materials for wood, gas, or oil
Permit- and certificate-of-occupancy-ready documentation
Family-owned, CSIA-certified, NFPA 211–compliant. We're the team you call when you want it done right the first time — no rotating subcontractors, no upsell pressure, no surprises. Same techs, same trucks, same standard.

The NFPA recommends a Level 1 inspection every year, with a sweep once buildup reaches 1/8" of creosote — for a wood fireplace you actually use, that's about once a heating season. The neighborly part: since we're already on the roof, the same crew checks your dryer vent and caps the visit with a quick whole-home safety look, so one appointment covers what would otherwise be three.
Yes — our inspectors hold current CSIA (Chimney Safety Institute of America) certifications, verifiable in the CSIA member directory at csia.org, and we have NFI specialists for fireplace work. The same trained crew handles your chimney, fireplace, dryer-vent and air-duct needs, so you're not juggling four different contractors for one house.
Yes — 24/7 response (subject to crew availability) for active leaks, an animal trapped in the flue, post-fire damage, and storm damage, same-day in most cases. One call reaches one crew that can handle whatever the situation turns out to need, instead of bouncing you between specialists while the water's still coming in.
Always — a written quote before we lift a tool, with photos of what we found, so you see exactly what you're approving. If the same visit turns up something in the dryer vent or ducts, it goes on one itemized quote and one invoice rather than a string of separate trips.
The Whole-Home Care Plan is our annual maintenance plan at $19.99/month ($240/year): a Level 1 inspection and sweep ($248 value), priority scheduling, 10% off all repairs, and emergency-response priority. Because one crew covers chimney, fireplace, dryer-vent and ducts, the plan keeps the whole house on a single schedule instead of a calendar full of separate service calls. Cancel anytime, no contract.
Last reviewed:
Other services in the Installation category.
Free written quote. Same-week scheduling. 24/7 emergency response when you need it.
Active leak, animal in flue, post-fire damage, or smoke event? Real humans on the line 7 AM to 12 AM every day — replies in under 2 minutes. Tech dispatch within 2 hours during business hours, subject to crew availability after-hours.
Emergency line